Project Details

Tendering Authority: GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS

Value: 55,832,200$

Start: 2016

State: Completed

It is the construction work of the tubular irrigation network, which will irrigate a total gross area of 22012 ha in the Viranşehir district of Şanlıurfa, which consists of the construction of the engineering structures, discharge channels, approach canal and pumping station.

Project Characteristics;
Starting Flow Rate (Q) : 14.792,00 l/s (P1) 8.655,00 l/s (P2.1)
Starting Diameter (D) : 3000 mm (P1 ve P2.1)
Irrigation Field : 22.012,00 ha (P1:13.926 ha+P2.1:8.086 ha)
Irrigation Type : Borulu
Irrigation Modulus : 0,89 l/sn/ha
Main Pipeline Length : 24.636,00 m (P1) ve 21.504,00 m (P2.1)
Spare Pipeline Length : 26.862,00 m (P1) ve 136.830,00 m (P2.1)
Tubular Drain Line Length : 19.251,00 m (P1) ve 6.151,00 m (P2.1)

The project, which has an irrigation area of 22 012 hectares within the provincial borders of Şanlıurfa, includes pumping stations, filter stations, GRP, HDPE and steel pipelines, all kinds of electrical and mechanical equipment (valves, armature, flow controls, etc.). Viranşehir P1 pump station irrigation project was entered by the General Directorate of State Hydraulic Works and controlled by the 15th Regional Directorate of State Hydraulic Works.
GRP pipelines: 93 000 meters, HDPE pipelines: 395 000 meters, steel pipelines: 6 750 meters
1 Pump Station,