MARDİN CEYLANPINAR PLAIN GRAVITY-FED IRRIGATION SECTION 1
Project Details
Tendering Authority: Ministry Of Agriculture And Forestry, GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS, DEPARTMENT OF PROJECT AND CONSTRUCTION
Value: 161,166,860$
Start: 2016
State: Completed
The construction of the necessary irrigation and drainage network in order to provide irrigation service to an agricultural land of 26496ha (8990 ha pumped, 17506 ha gravity-fed). Project Characteristics; Total Irrigation Area: 26 496 Distribution: 17416 ha (Gravity-fed) 9080 ha (MCY2 ve MCY4 Pumped) Irrigation Type: Pipeline Irrigation Modulus: 0,89 l/sn/ha GRP Pipeline Length: 124261,73 m HDPE 100 Pipeline Length: 476659,47 m Drain Line Length: 170908,50 m
The project, which has an irrigation area of 26 400 hectares within the provincial borders of Şanlıurfa, includes pumping stations, filter stations, GRP, HDPE and steel pipelines, all kinds of electrical and mechanical equipment (valves, armature, flow controls, etc.). The MC-1 irrigation project was issued by the General Directorate of State Hydraulic Works and controlled by the 15th Regional Directorate of DSI. CTP boru hatları: 103 000 metre, HDPE boru hatları: 466 450 000 metre, çelik boru hatları: 3 200 metre 2 Pompa İstasyonu, 2 Su Deposu