Project Details

Tendering Authority: SYRIA ARAB REPUBLIC MINISTRY OF IRRIGATION, GENERAL DIRECTORATE OF LAND IMPROVEMENT

Value: 33,554,900$

Start: 2003

State: Completed

It is the irrigation and drying of 3000 hectares of land on the banks of the Belih River, 75 km north of Raqqa city. The main channel is 9.913 km long and has a capacity of 17m3/s. This canal irrigates 4200 hectares of Belih region. It has 7 sockets and has a single system. There are two bridged passages, a tubular overpass and two waste water channels for drying.
The main channel is 9,913 km long and has a discharge capacity of 17 m/s.
This canal irrigates 4200 hectares of Al Baleekh Plain. It has a structure with 7 outputs and a single system. It has two junctions, a piped passage and two waste water channels.

  • Net length 37,602 km made of GRP with Ø2000-Ø350 mm diameter
  • Pipes with a diameter less than Ø350 mm are PVC and the pipe length is PVC 99,371 km and they are buried underground.
  • Drenflex pipe closed drainage channel 651 566 m
  • Collector drain channel 41 000 m
  • Al Baleekh Main drainage channel 7.704 m
  • Secondary and Tertiary open drainage channel 51.387 m
  • Unpaved Roads (Field Roads) 141 km